某黄金矿山采掘工程全过程造价计价方法应用
Application of the Whole Process Cost Valuation Method for a Gold Mine Mining Project
刘强1
作者信息
- 1. 山东黄金矿业(莱州)有限公司焦家金矿,山东莱州 261400
- 折叠
摘要
随着黄金市场的不断发展,黄金矿山的开采工程也越来越受到关注.在黄金矿山采掘工程中,正确的造价计价方法是确保项目顺利进行的重要保障.本文将介绍某黄金矿山采掘工程全过程的直接费用计算法、间接费用计算法和相似工程比较法三种造价计价方法,同时与该工程实际情况相结合分析其在实际项目中的效果,旨在为控制黄金矿山采掘工程成本提供借鉴.
Abstract
With the continuous development of the gold market,the mining engineering of gold mines is also receiving increas-ing attention.The correct cost estimation method is an important guarantee for the smooth progress of gold mining projects.This article will introduce three cost estimation methods for the entire process of a gold mine excavation project:direct cost cal-culation method,indirect cost calculation method,and similar engineering comparison method.At the same time,combined with the actual situation of the project,their effects in actual projects will be analyzed,aiming to provide reference for control-ling the cost of gold mine excavation projects.
关键词
黄金矿山/采掘工程/造价计价Key words
gold mines/mining engineering/cost estimation引用本文复制引用
出版年
2024