汉钢2280 m3高炉护炉强化冶炼实践
Strengthening Smelting Practice of 2280m3 Blast Furnace Pro-tection at Han Steel
张宝婷 1周皓1
作者信息
- 1. 陕钢集团汉中钢铁有限责任公司,陕西汉中 724200
- 折叠
摘要
为了解决2018年汉钢2280 m3高炉炉缸壁温度偏高的问题而采取了一系列措施,包括提钛护炉、强化原燃料管理和更换延长风口套等.通过健全炉缸监控系统、优化操作制度和加强炉前排铁,成功使炉缸活动起来,并有效控制了侧面温度.这不仅提升了高炉的熔炼效果,还确保了安全操作,提高了经济性能,实现了护炉和生产的平衡.
Abstract
In order to solve the problem of high furnace wall temperature in the 2280 m3 blast furnace of Han Steel in 2018,a series of measures have been taken,including titanium protection,strengthening raw fuel management,and replacing the ex-tended tuyere sleeve.By improving the furnace monitoring system,optimizing operating procedures,and strengthening the front iron of the furnace,the furnace has been successfully activated and the side temperature has been effectively controlled.This not only improves the smelting efficiency of the blast furnace,but also ensures safe operation,improves economic performance,and achieves a balance between furnace protection and production.
关键词
钛矿护炉/炉缸监测/高炉操作Key words
titanium ore furnace protection/hearth monitoring/blast furnace operation引用本文复制引用
出版年
2024