新疆石油天然气2024,Vol.20Issue(2) :56-62.DOI:10.12388/j.issn.1673-2677.2024.02.007

新疆MH气藏改建储气库交变注采出砂机制

The Mechanism of Sand Production under the Alternating Injection-Production Mode of Gas Storage in Xinjiang MH Gas Reservoir

田守嶒 张文宏 翁锦涛 关子越 王剑波 刘敦卿
新疆石油天然气2024,Vol.20Issue(2) :56-62.DOI:10.12388/j.issn.1673-2677.2024.02.007

新疆MH气藏改建储气库交变注采出砂机制

The Mechanism of Sand Production under the Alternating Injection-Production Mode of Gas Storage in Xinjiang MH Gas Reservoir

田守嶒 1张文宏 2翁锦涛 2关子越 3王剑波 1刘敦卿1
扫码查看

作者信息

  • 1. 中国石油大学(北京)克拉玛依校区,新疆克拉玛依 834000
  • 2. 中国石油大学(北京),北京昌平 102249
  • 3. 中国石油新疆油田分公司工程技术研究院,新疆克拉玛依 834000
  • 折叠

摘要

新疆MH气藏经过多年衰竭式开采,为保障季节调峰需求,现将衰竭气藏改建储气库.受储气库交变注采的影响,注采气过程中储层易发生出砂,对储气库的运行及稳定具有一定的影响.针对储气库交变注采模式下的出砂机理,采用储层岩心开展物性、岩石力学与交变驱替实验,分析了岩心主要成分、胶结情况及力学性质,探究了生产压差、围压和交变注采过程对出砂的影响.实验研究结果表明,储层骨架间具有溶蚀绢化现象,黏土矿物中高岭石含量高,力学强度性质较弱,在储气库工况下有发生出砂的风险.在循环注采条件下,生产压差的增加促进了砂的产出,当生产压差超过6 MPa时,岩石处于临界出砂状态.围压的增加导致了出砂的提前,随着围压的升高,出砂量先增大后减少,孔隙通道的挤压是引发出砂量降低的主要因素.交变注采与常规采气相比,阶段出砂量呈现波浪式变化.多轮次交变注采引发的冲蚀过程和胶结疲劳破坏是加剧储气库出砂现象的主要因素.

Abstract

The MH gas reservoir in Xinjiang has been through many years of depletion recovery.In order to meet the seasonal peak de-mand,the depleted gas reservoir is being reconstructed into an underground gas storage(UGS).Due to alternating gas injection-pro-duction,the reservoir is prone to sand production during the injection-production process,which impacts on the operation and stability of the UGS.In order to clarify the mechanism of sand production under the alternating injection-production mode of the UGS,this pa-per used the reservoir cores to carry out the physical property,rock mechanics and alternating flooding experiments.The main composi-tion,cementation and mechanical properties of the cores were analyzed,and the effects of drawdown pressure,confining pressure and alternating injection-production process on sand production were investigated.The experiment results show that the reservoir skeleton presents dissolution sericitization,high kaolinite content in clay minerals,weak mechanical strength properties,and has the risks of sand production under the UGS operating conditions.During cyclic injection and production,an increase in drawdown pressure pro-motes sand production.When the drawdown pressure exceeds 6 MPa,the rock reaches a critical state of sand production.Increasing confining pressure leads to premature sand production.Moreover,as the confining pressure rises,sand production first increases and then decreases.The extrusion of pore channels is the main driver for the decrease in sand production.In comparison to conventional gas production,the amount of produced sand during the alternating injection-production exhibits a wave-like pattern.The dynamic erosion process and fatigue failure of cementation,induced by multiple rounds of alternating injection-production,are the main contributors to exaggerate sand production from the UGS.

关键词

储气库/出砂机理/交变注采/出砂实验/衰竭气藏

Key words

gas storage/sand production mechanism/alternating injection-production/sand production experiment/depleted gas reservoir

引用本文复制引用

基金项目

中国石油新疆油田分公司科研项目(XQHX20220042)

出版年

2024
新疆石油天然气
中国石油新疆职工培训中心(新疆石油学院)

新疆石油天然气

影响因子:0.219
ISSN:1673-2677
参考文献量26
段落导航相关论文