The phenomenon of Dana simulation and fake simulation is common in Chinese enterprises,and the simulation system is the way to solve the problem of false simulation.From the perspective of constituent elements,the comprehensive simulation system includes strategy,maturity,process,standards,norms,talent,organization,software,hardware,and platforms.Planning and construction are two stages of system development.The simulation system construction plan can be divided into three stages such as near,medium,and long-term.The construction goals of each stage are evaluation design,optimization design,and drive design.Through the construction of simulation system,a comprehensive simulation platform that meets the needs of enterprises can be formed,so as to fully utilize the comprehensive efficiency generated by the simulation system.Only by establishing a scientific and comprehensive simulation system can simulation results be considered as the basis for product design,and enterprises can turn simulation into productivity,so as to help them acquire the ability to drive research and development through simulation.
Comprehensive Simulation SystemSimulation System PlanningConstruction of Simulation System