Optimization Design of Secondary Dynamic Wave Unit in Sintering Fume Acid Production
In order to solve the problems of frequent malfunctions of the electric demister and unfavorable acid color of the finished product during sintering fume acid production,optimization design is carried out to lower the failure rate,improve service life of the unit,reduce maintenance work and ensure maintenance safety.