一重技术2024,Issue(3) :28-31.DOI:10.3969/j.issn.1673-3355.2024.03.007

核电管座尺寸变化技术分析

Technical Analysis of Dimensional Changes of Nuclear Power Pipe Seat

苏伟 武术宝 毕振军
一重技术2024,Issue(3) :28-31.DOI:10.3969/j.issn.1673-3355.2024.03.007

核电管座尺寸变化技术分析

Technical Analysis of Dimensional Changes of Nuclear Power Pipe Seat

苏伟 1武术宝 毕振军
扫码查看

作者信息

  • 1. 一重集团大连核电石化有限公司,辽宁 大连 116113
  • 折叠

摘要

核电产品由于制造周期长,工序跨度较大,最终交付时管座出现尺寸超差或不进差问题.对此,通过技术分析,发现尺寸变化原因,解决管座超差问题.

Abstract

Due to long manufacturing cycle and large process span of nuclear power products,pipe seat is found with out of tolerance problems during final delivery.Therefore,technical analysis is carried out to identify the reasons for dimensional changes and resolve the out of tolerance problem of the pipe seat.

关键词

精密尺寸/原因分析/残余应力/应力分析

Key words

Precise dimension/cause analysis/residual stress/stress analysis