Analysis on the Influence of Upstream Reservoir Dam Break on Railway Freight Yard
The newly-built Xianning freight yard comprehensive logistics base engineering is located in the downstream of Wangjiaci reservoir.Once the dam breaks,it will pose a great threat to the operation safety of railway freight yard.In the stage of railway survey,the influence of upstream reservoir on the flow at the site of new freight yard is studied by investigating the reservoir situation in detail and combining with the hydrological survey and design specifications of railway engineering,which provides an important reference for the site selection and design of freight yard.The relevant research ideas can provide reference for the survey and design of similar railway engineering.
upstream reservoir dam breakrailway freight yardsurvey and designdam break flow