建设工程造价控制管理过程中的问题及对策

Problems and Countermeasures in Construction Engineering Cost Control Management

贾昆霖
工程技术研究2024,Vol.9Issue(2) :166-168.DOI:10.19537/j.cnki.2096-2789.2024.02.054

建设工程造价控制管理过程中的问题及对策

Problems and Countermeasures in Construction Engineering Cost Control Management

贾昆霖1
扫码查看

作者信息

  • 1. 嘉峪关市宏顺建设监理咨询有限责任公司,甘肃 嘉峪关 735100
  • 折叠

摘要

如何应对当下的压力和挑战及抓住行业转型的发展机遇,是当下建筑企业探索的重要改革事项.基于此,文章分析了建设工程造价控制管理过程中出现的部分问题,探讨了解决相关问题的对策,从项目前期、招投标、合同签订、施工等阶段进行具体阐述.

Abstract

How to deal with the current pressure and challenges and seize the development opportunities of the industry transformation is an important reform issue for construction enterprises to explore.Based on this,this paper analyzes some problems in the process of construction engineering cost control management,discusses countermeasures to solve the related problems,and elaborates in detail on the stages such as project preparation,bidding,contract signing and construction.

关键词

建设工程/造价控制/合同管理

Key words

construction engineering/cost control/contract management