Analysis on Adjacent Construction Risks and Countermeasures of Bridge Overcrossing Railway-related Engineering
Bridge is a vital part of transportation infrastructure,which plays an important role in carrying vehicles,pedestrians and goods.However,there are many risk factors involved in the construction of bridges overcrossing railway-related engineering,including construction risks,design risks and environmental risks.Taking the bridge engineering overcrossing national highway and existing railway line in northern Anhui as an example,this paper discusses the risks and countermeasures of the bridge engineering overcrossing the existing railway line in such railway-related engineering.Through the analysis of engineering parameters,geographical environment,on-site management and other aspects,it puts forward targeted risk control strategies and construction safety measures,such as strengthening geological monitoring,strengthening communication and coordination,and paying attention to the review of blockade schemes.
bridgerailway-related engineeringadjacent construction