Optimization Design of Boom Web Layout for Tower Cranes Used in High-rise Residential Construction
Aiming at the problems of low lifting torque and poor lifting capacity of tower cranes used in the construction of high-rise residential buildings,Design a variable cross-section boom web member based on the maximum torque condition of the tower crane;Following the principle of periodic optimization,from the perspective of material selection,force analysis,comparison,and horizontal attachment of the pull rod,achieve optimization of the layout of the tower crane boom web.By comparing the tower cranes before and after optimizing the layout of the boom web,it is proven that the new optimized design scheme can effectively increase the torque of the tower crane and improve the overall lifting capacity of the crane.