首页|塔梁同步施工工艺下塔梁固结部位应力影响分析

塔梁同步施工工艺下塔梁固结部位应力影响分析

扫码查看
文章利用有限元软件Midas Fea模拟了矮塔斜拉桥在塔梁同步施工工艺下塔梁固结部位局部实体模型,并与典型施工阶段下整体计算模型和施工监控实测数据进行了对比,分析总结了采用塔梁同步施工工艺的矮塔斜拉桥,在不同施工阶段塔梁固结部位的截面应力变化规律.
Analysis on Stress Influence on the Tower-Beam Consolidation Part under Tower-Beam Synchronous Construction Technology
This paper uses finite element software Midas Fea to simulate the local solid model of the tower-beam consolidation part of the extradosed cable-stayed bridge under the tower-beam synchronous construction technology,and compares it with the overall calculation model and the construction monitoring data under the typical construction stage.The section stress variation law of the tower-beam consolidation part of the extradosed cable-stayed bridge with tower-beam synchronous construction technology at different construction stages is analyzed and summarized.

tower-beam synchronous constructiontower-beam consolidationsection stressfinite element

杨德厚

展开 >

中交第二公路勘察设计研究院有限公司,湖北 武汉 430050

塔梁同步施工 塔梁固结 截面应力 有限元

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(4)
  • 5