工程技术研究2024,Vol.9Issue(4) :64-66.DOI:10.19537/j.cnki.2096-2789.2024.04.021

地铁工程主体渗漏水治理施工技术研究

Research on Construction Technology for Water Leakage Treatment in the Main Body of Subway Engineering

李璐楠
工程技术研究2024,Vol.9Issue(4) :64-66.DOI:10.19537/j.cnki.2096-2789.2024.04.021

地铁工程主体渗漏水治理施工技术研究

Research on Construction Technology for Water Leakage Treatment in the Main Body of Subway Engineering

李璐楠1
扫码查看

作者信息

  • 1. 中铁十二局集团第二工程有限公司,山西 太原 030032
  • 折叠

摘要

为解决传统防水堵漏技术效果差、成本高等问题,文章对地铁工程主体渗漏水治理施工技术进行了研究,重点指出了该工艺的技术控制要点、施工注意事项及质量控制措施.相比传统技术,该渗漏水治理技术先进,经济效益良好,治理效果显著,可广泛应用于地铁工程及施工条件相近的其他隧道工程中,值得大力推广.

Abstract

In order to solve the problems of poor effect and high cost of traditional waterproofing and plugging technology,this paper studies the construction technology for water leakage treatment in the main body of subway engineering,and points out the technical control points,construction precautions and quality control measures of the technology.Compared with the traditional technology,this water leakage treatment technology is advanced,the economic benefit is good,and the treatment effect is remarkable.It can be widely used in subway engineering and other tunnel engineering with similar construction conditions,and it is worth promoting vigorously.

关键词

地铁工程/盾构隧道/渗漏水治理/注浆/分级堵漏

Key words

subway engineering/shield tunnel/water leakage treatment/grouting/graded plugging

引用本文复制引用

出版年

2024
工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
参考文献量5
段落导航相关论文