桥梁人行道现浇拱圈工程中的满堂支架及现浇施工要点分析
Analysis on Key Points of Full Support and Cast-in-place Construction in Bridge Sidewalk Cast-in-place Arch Ring Engineering
马天慧1
作者信息
- 1. 中交建筑集团投资与产业发展事业部,北京 100010
- 折叠
摘要
文章主要结合济南市济阳区滨河市政设施建设项目,立足施工重难点,分析了满堂支架施工和现浇施工的要点.分析表明,在桥梁人行道现浇拱圈工程施工中,搭设满堂支架可为钢筋、混凝土、模板等各道工序提供安全、稳定的操作平台,进而保障桥梁人行道现浇拱圈工程施工任务顺利完成.
Abstract
Based on the construction project of Binhe municipal facilities in Jiyang District of Jinan City,this paper analyzes the key points of full support construction and cast-in-place construction based on the key and difficult points of construction.The analysis shows that in the construction of bridge sidewalk cast-in-place arch ring engineering,the setting of the full support can provide a safe and stable operation platform for various procedures such as steel bars,concrete and formwork,so as to ensure the successful completion of the construction task of bridge sidewalk cast-in-place arch ring engineering.
关键词
桥梁人行道/现浇拱圈工程/满堂支架/现浇施工Key words
bridge sidewalk/cast-in-place arch ring engineering/full support/cast-in-place construction引用本文复制引用
出版年
2024