首页|临海建筑逆作法施工关键技术分析

临海建筑逆作法施工关键技术分析

扫码查看
文章结合澳门金银岛酒店的逆作法深基坑工程,阐述了临海建筑逆作法施工过程中土方开挖和关键节点连接构造施工技术.通过优化土方开挖中的机械设备选型和取土口位置,有效减少了土方暗挖开挖量,提高了出土效率,同时,探究了地下水平结构和竖向结构的连接方式和施工工艺,保证了逆作法施工的质量,节省了施工工期.该研究在经济性和技术性方面取得了良好效益,可为后续临海建筑逆作法地下结构施工提供参考.
Analysis on Key Construction Technology of Reverse Method in Coastal Building
Based on the deep foundation pit engineering constructed by reverse method in Macao's Treasure Island Hotel,this paper expounds the construction technologies of earthwork excavation and key node connection in the reverse construction process of coastal buildings.By optimizing the selection of mechanical equipment and the location of soil sampling in earthwork excavation,the amount of underground excavation has been effectively reduced,and the excavation efficiency has been improved.At the same time,the connection mode and construction technology of underground horizontal structure and vertical structure are explored,which ensures the quality of reverse construction and saves the construction period.The research has achieved good economic and technical benefits,providing reference for the subsequent reverse construction of underground structures in coastal buildings.

coastal buildingdeep foundation pitreverse method

冯旭

展开 >

中国土木工程集团有限公司,北京 100038

临海建筑 深基坑 逆作法

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(5)