The Application of EPS Roadbed in the Construction of High Roadbed Road with Buried Pipeline
Urban underground pipeline facilities are the"lifeline"of the normal operation of urban functions.In order to ensure the normal use of urban pipeline facilities,it is necessary to control the additional load and land subsidence during the construction of high subgrade of buried pipeline.Taking the road construction of the new project of Dongjing Road crossing the sewage treatment pipeline as an example,this paper analyzes the difference of additional load and settlement between conventional construction and EPS(Expanded Polystyrene)construction,and introduces the specific method of EPS subgrade construction above the pipeline.As a successful practice of EPS subgrade in the construction of buried pipeline high subgrade,this case has reference significance for similar engineering construction.