首页|某LNG码头栈桥桩基对海堤防渗的影响分析

某LNG码头栈桥桩基对海堤防渗的影响分析

扫码查看
为保证涉河建设不削弱或降低海堤工程的防洪(潮)标准,确保海堤工程安全,保障区域经济稳定发展,文章构建了某LNG码头栈桥桩基与海堤有限元模型,利用数值分析海堤打桩前后的渗透稳定性.结果表明,打桩前海堤渗流坡降小于规范允许值,打桩后海堤渗流坡降不满足规范要求,需采取防渗加固措施.海堤打桩范围经背海侧堤身回填、压密注浆处理后水力坡降小于规范允许值,可为同类工程的设计提供借鉴.
Analysis of the Influence of the Pile Foundation of a LNG Terminal Trestle on the Anti-seepage of the Seawall
In order to ensure that river-related construction does not weaken or reduce the flood control(tide)standard of seawall engineering,ensure the safety of seawall engineering and ensure the stable development of regional economy,this paper constructs a finite element model of pile foundation and seawall of a LNG wharf trestle,and uses numerical analysis to analyze the seepage stability of seawall before and after piling.The results show that the seepage slope of the seawall before piling is less than the allowable value of the code,and the seepage slope of the seawall after piling does not meet the requirements of the code,so it is necessary to take anti-seepage reinforcement measures.The hydraulic gradient of the seawall pile driving range is less than the allowable value of the specification after backfilling and compaction grouting on the back side of the seawall,which can provide reference for the design of similar projects.

wharftrestle bridgeseawallanti-seepage

陈云国

展开 >

上海浦河工程设计有限公司,上海 200333

码头 栈桥 海堤 防渗

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(7)
  • 3