首页|喀斯特地区全护筒跟进超长桩基施工方法的应用

喀斯特地区全护筒跟进超长桩基施工方法的应用

扫码查看
在喀斯特发育地区,桥梁钻孔灌注桩施工常出现漏浆、塌孔等现象,给施工带来困扰.为了减轻对周边复杂环境的影响,确保工程顺利进行,文章以白花特大桥为例,对喀斯特地区全护筒跟进超长桩基施工技术进行分析,该施工技术的成功应用取得了一定的社会效益和经济效益,可为今后同类工程提供指导.
The Application of Full Casing Follow-up Super-long Pile Foundation Construction Method in Karst Area
In the karst development area,the phenomenon of slurry leakage and hole collapse often occurs in the construction of bridge bored pile,which brings trouble to the construction.In order to reduce the impact on the surrounding complex environment and ensure the smooth progress of the project,this paper takes Baihua Bridge as an example to analyze the construction technology of full casing follow-up super-long pile foundation in karst area.The successful application of this construction technology has achieved certain social and economic benefits,which can provide guidance for similar projects in the future.

karst areaentire casingpile foundation construction

赵小军

展开 >

中铁二十局集团第二工程有限公司,陕西西安 710014

喀斯特地区 全护筒 桩基施工

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(7)
  • 5