首页|大跨钢桁架桥梁全预制装配式施工方法分析

大跨钢桁架桥梁全预制装配式施工方法分析

Analysis on Fully-prefabricated Assembly Construction Method for Large-span Steel Truss Bridge

扫码查看
传统的桥梁施工工艺存在施工效率低、施工环境具有局限性等多种实际问题,这些问题在当前的社会环境下日益凸显.全预制装配式施工技术的应用有效解决了上述问题,在保证桥梁工程安全质量的同时,显著提高了施工效率.因此,文章针对大跨钢桁架桥梁全预制装配式施工方法展开思考,探究全预制装配式桥梁施工技术在实际工程中的应用方案,旨在为桥梁工程的施工建设提供更科学、有效的技术支持.
The traditional bridge construction technology has many practical problems,such as low construction efficiency and limited construction environment.These problems are increasingly prominent in the current social environment.The application of fully-prefabricated assembly construction technology effectively solves the above problems,and significantly improves the construction efficiency while ensuring the safety and quality of bridge engineering.Therefore,this paper considers the fully-prefabricated assembly construction method for large-span steel truss bridge,and explores the application scheme of fully-prefabricated assembly bridge construction technology in practical engineering,aiming to provide more scientific and effective technical support for the construction of bridge engineering.

prefabrication processinggrout sleevehoisting construction

王小平

展开 >

贵州省交通规划勘察设计研究院股份有限公司,贵州 贵阳 550000

预制加工 灌浆套筒 吊装施工

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(9)