主城区管道分流工程明挖暗顶施工技术研究

扫码查看
文章结合工程实例,阐述了主城区管道分流工程明挖暗顶施工技术,将成熟工艺中的管道明挖和顶管施工技术进行优化组合,在主城区管道分流工程施工中,有效解决了因施工时周边交通压力大、主城区地下地质管线复杂、沟槽开挖后暴露时间较长及安全性较低、传统管道施工工序烦琐、施工进度缓慢等问题,工艺操作简单,方便快捷,城区交通安全和人员操作安全有保证,且施工进度快,能快速缓解主城区交通压力.
Research on Open Excavation and Hidden Pipe Jacking Construction Technology for Pipeline Diversion Engineering in the Main Urban Area
Based on the engineering example,this paper expounds the open excavation and hidden pipe jacking construction technology for pipeline diversion engineering in main urban area,and the mature pipeline open excavation and pipe jacking construction technology is optimized and combined.In the construction of pipeline diversion engineering in the main urban area,the problems of large surrounding traffic pressure during the construction,complex underground geological pipelines in the main urban area,long exposure time and low safety after trench excavation,complicated traditional pipeline construction procedures,and slow construction progress are effectively solved.The process operation is simple,convenient and fast,ensuring the urban traffic safety and personnel operation safety,and the construction progress is fast,which can quickly alleviate the traffic pressure in the main urban area.

main urban areapipeline diversionopen excavation and hidden pipe jacking construction technology

杨海丽、贠凯峰、毛彤、李娴、张丽

展开 >

甘肃第七建设集团股份有限公司,甘肃 兰州 730000

主城区 管道分流 明挖暗顶施工技术

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(10)
  • 4