新能源风电工程项目吊装施工技术要点分析
Analysis on Key Point of Hoisting Construction Technology for New Energy Wind Power Engineering Project
周波1
作者信息
- 1. 中电建新能源集团股份有限公司南方分公司,广东 广州 510000
- 折叠
摘要
近年来,风电工程项目总量逐年递增,风电机组的规模越来越大,单机容量持续增长,给风电工程项目吊装施工增加了难度.基于此,文章通过风电工程吊装施工实例阐述了吊装施工技术要点,包括塔架、塔筒、发电机组、机舱、叶轮的吊装施工技术要点,旨在保障施工进度,提高施工质量,确保施工安全.
Abstract
In recent years,the total number of wind power engineering projects has been increasing year by year,the scale of wind turbines has become larger and larger,the capacity of single unit has continued to grow,which has added the difficulty to hoisting construction of wind power engineering projects.Based on this,this paper expounds the key points of hoisting construction technology through the example of hoisting construction of wind power engineering,including the key points of hoisting construction technology of tower frame,tower tube,generator set,engine room and impeller,in order to ensure the construction progress,improve the construction quality and ensure the construction safety.
关键词
新能源/风电工程/吊装施工Key words
new energy/wind power engineering/hoisting construction引用本文复制引用
出版年
2024