步履式钢槽梁顶推施工安全管理研究

Research on Safety Management of Incremental Launching Construction of Walking Steel Trough Beam

李建辉
工程技术研究2024,Vol.9Issue(10) :141-143.DOI:10.19537/j.cnki.2096-2789.2024.10.046

步履式钢槽梁顶推施工安全管理研究

Research on Safety Management of Incremental Launching Construction of Walking Steel Trough Beam

李建辉1
扫码查看

作者信息

  • 1. 中交第二航务工程局有限公司第五工程分公司,湖北 武汉 430040
  • 折叠

摘要

文章以S326浏阳市澄潭江至宁乡县沙田公路工程为主要研究对象,对步履式钢槽梁顶推施工安全管理要点及措施进行研究.研究表明,通过施工流程管理,采取质量及安全保障措施,可有效降低步履式钢槽梁顶推施工过程中的安全风险,提高施工质量和效率.

Abstract

This paper takes the S326 Chengtan River in Liuyang City to Shatian in Ningxiang County highway engineering as the main research object,and studies the safety management points and measures of the incremental launching construction of walking steel trough beams.The research shows that through the construction process management and adopting quality and safety guarantee measures,the safety risks in the incremental launching construction process of the walking steel trough beam can be effectively reduced and the construction quality and efficiency can be improved.

关键词

步履式钢槽梁/顶推施工/安全技术/风险控制

Key words

walking steel trough beam/incremental launching construction/safety technology/risk management