首页|预制装配式建筑施工常见问题及对策研究

预制装配式建筑施工常见问题及对策研究

Research on Common Problem and Countermeasure in Prefabricated Building Construction

扫码查看
为提高装配式建筑的施工质量,文章首先总结了装配式建筑体系,随后以某高层住宅建筑为研究对象,基于排列图法分析装配式建筑构件在生产环节和施工环节中常见问题的频率、成因、表现形式等.随后基于BIM技术建立装配式建筑的三维模型,模拟了构件的生产、运输、吊装、拼装等施工环节,研究成果表明,BIM技术能有效解决施工问题,并降低施工成本,从而进一步推动建筑工程可持续发展.
In order to improve the construction quality of prefabricated buildings,this paper first summarizes the prefabricated building system,then takes a high-rise residential building as the research object to analyze the frequency,causes and manifestations of common problems in the production and construction links of prefabricated building components based on the Pareto Diagram method.Subsequently,a three-dimensional model of prefabricated building is established based on BIM technology,and the construction links such as production,transportation,hoisting and assembly of components are simulated.The research results show that BIM technology can effectively solve the construction problems and reduce the construction cost,so as to further promote the sustainable development of building engineering.

prefabricated buildingcomponent productionBIM technology

程海军、曹雪松

展开 >

济南齐鲁建设项目管理有限责任公司,山东 济南 250000

装配式建筑 构件生产 BIM技术

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(10)
  • 9