首页|综合勘察技术在核电厂初可研勘察中的应用

综合勘察技术在核电厂初可研勘察中的应用

扫码查看
核电厂初步可行性研究阶段勘察的主要目的是结合候选厂址现有岩土资料,外业采用勘探、工程物探、地质调绘等多种手段,初步查明候选厂址区的岩土工程条件,对厂址区的地质构造特征、场地稳定性、地层岩性分布、核电厂地基适宜性、不良地质作用、边坡稳定性等方面作出初步评价,为初步可行性研究报告的编制提供依据.文章以广东某核电厂初步可行性研究阶段勘察为例,总结了地调、钻探、物探等综合勘察技术在核电厂初可研勘察中的应用.
The Application of Comprehensive Investigation Technology in Preliminary Feasibility Study Investigation of the Nuclear Power Plant
The main purpose of the investigation in preliminary feasibility study stage of the nuclear power plant is to preliminarily identify the geotechnical engineering conditions of the candidate site area by means of exploration,engineering geophysical prospecting,geological mapping in the field in combination with the existing geotechnical data of the candidate site.The geological structure characteristics,site stability,stratigraphic lithology distribution,nuclear power plant foundation suitability,adverse geological effect,slope stability and other aspects of the site area are preliminarily evaluated to provide a basis for the preparation of the preliminary feasibility study report.Taking the investigation in preliminary feasibility study stage of a nuclear power plant in Guangdong as an example,this paper summarizes the application of comprehensive investigation technologies such as geological survey,drilling and geophysical prospecting in the preliminary feasibility study investigation of the nuclear power plant.

comprehensive investigation technologygeological drillingnuclear power plantpreliminary feasibility study

杨晨、赵家福、张建、章建新、姜鹏

展开 >

深圳市工勘岩土集团有限公司,广东 深圳 518026

综合勘察技术 地质钻探 核电厂 初步可行性研究

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(11)