首页|隧道群下穿既有地铁运营隧道结构保护风险评估控制及变形预测

隧道群下穿既有地铁运营隧道结构保护风险评估控制及变形预测

扫码查看
文章以 5条不同直径的盾构隧道密集下穿地铁运营8号线区间隧道为例,研究盾构隧道群下穿对既有隧道变形的影响,评估存在的地铁结构保护风险,提出相关控制理念,并采用有限元软件Midas GTS NX模拟隧道群下穿地铁 8号线施工过程.结果表明,既有地铁隧道上下行结构最大累计水平位移、沉降分别为1.74 mm、10.46 mm,均未达到预警值.研究可为单线、多线或不同直径盾构下穿既有地铁运营隧道施工提供技术管理参考.
Risk Assessment,Control,and Deformation Prediction of Structural Protection for Tunnel Group Undercrossing Existing Subway Operating Tunnel
This paper takes the example of five shield tunnels with different diameters densely undercrossing the operating interval tunnel of Metro Line 8 to study the influence of shield tunnel group undercrossing on the deformation of existing tunnels,evaluate the existing risks of subway structural protection,propose relevant control concepts,and use finite element software Midas GTS NX to simulate the construction process of tunnel group undercrossing Metro Line 8.The results shows that the maximum cumulative horizontal displacement and settlement of the upper and lower structures of the existing subway tunnel are 1.74 mm and 10.46 mm respectively,which do not exceed the warning value.The research can provide technical management references for the construction of single-line,multi-line or different-diameter shield tunnels undercrossing existing subway operating tunnels.

existing tunnelundercrossing constructionrisk assessmentdeformation prediction

荣露

展开 >

广州地铁工程咨询有限公司,广东 广州 510010

既有隧道 下穿施工 风险评估 变形预测