Research on Multi-head Small-diameter Deep Mixing One-time Wall Forming Technology in Dam Engineering
In view of the limitations of traditional anti-seepage methods in dam engineering,this paper takes the actual dam engineering as an example,and expounds the multi-head small-diameter deep mixing one-time wall forming technology in dam engineering from the aspects of positioning and setting out,cement slurry preparation,multi-head drilling,guniting and piling machine displacement,as well as lifting guniting and repeated mixing.The aim is to provide comprehensive and systematic theoretical guidance and technical support for the design,construction and quality management of dam seepage control engineering,and to promote its wide application and technological innovation in the construction of water conservancy engineering.
dam engineeringslurry preparationpositioning and setting outpiling machine displacement