Analysis on Fabricated Revetment Engineering Process and Technology
There are some limitations in the traditional revetment construction of inland waterway engineering,and the construction flexibility and environmental protection requirements are difficult to meet the needs of inland waterway engineering construction.The application of fabricated revetment technology can meet the needs of diversified scenarios,and the maintenance cost is low,which is worth promoting.However,the implementation of this process has strict requirements for the prefabrication,transportation and hoisting of finished products.In order to give full play to the advantages of the fabricated revetment construction process,its technical points must be mastered.Based on this,this paper analyzes the key technical points of fabricated revetment process in combination with the No.1 bid engineering of Youdun Port waterway regulation engineering(Beiqing Highway Bridge-Zhujiabang),and provides technical reference for the construction of similar projects in the future.
construction technologyfabricated revetmentinland waterway