Analysis on Risk Removal and Reinforcement Engineering Construction Technology of Changtan Reservoir in Dejiang County
In order to explore the effective means of reservoir risk removal and reinforcement construction,this paper takes Changtan Reservoir in Dejiang County as an example to analyze the construction scheme of the reservoir risk removal and reinforcement engineering by adopting case study method,completes the engineering layout and construction preparation according to the designed risk removal and reinforcement scheme,and carries out the construction from the aspects of dam regulation,grouting,drainage facilities,soil and water conservation,etc.,and finally analyzes the economic benefits of the engineering operation management after reinforcement,in order to ensure the safe operation of the reservoir and maximize its economic benefits.
Changtan Reservoirrisk removal and reinforcement engineering construction technologydam regulation and reinforcement