Analysis on Construction and Management of Mountain Wind Power Engineering
In order to solve the problem of mountain wind power engineering construction and improve the level of construction management,this paper takes Dingdongpo wind power engineering as an example,introduces the general situation of the engineering,points out the design characteristics and management difficulties of mountain wind power engineering,and expounds the management measures of mountain wind power engineering construction process from five aspects:technical measures,on-site construction management,quality management,safety management and cost management.The research shows that clarifying the key and difficult points of the construction process and formulating a sound and feasible management plan from the actual situation of mountain wind power engineering can improve the construction efficiency and quality of wind power engineering and maximize the comprehensive benefits.
mountain wind power engineeringconstruc-tion managementcost managementsafety management