工程技术研究2024,Vol.9Issue(15) :204-207.DOI:10.19537/j.cnki.2096-2789.2024.15.067

红层缓丘区造地工程设计与施工质量控制措施研究

Research on the Design and Construction Quality Control Measure of Land Reclamation Engineering in Low Hilly Red Bed Area

李鹏
工程技术研究2024,Vol.9Issue(15) :204-207.DOI:10.19537/j.cnki.2096-2789.2024.15.067

红层缓丘区造地工程设计与施工质量控制措施研究

Research on the Design and Construction Quality Control Measure of Land Reclamation Engineering in Low Hilly Red Bed Area

李鹏1
扫码查看

作者信息

  • 1. 四川省公路规划勘察设计研究院有限公司,四川 成都 610041
  • 折叠

摘要

土地资源的日益紧缺导致人工围海造地、削峰填谷等工程不断增多,造地工程在不同的地形地貌、工程地质条件下所面临着不同的工程技术难题.文章结合四川某红层缓丘区造地工程的实际情况,参考后期场地内建筑物的重要性程度,探讨了造地工程工后沉降控制标准、处治方法及施工质量控制措施,可为类似项目提供借鉴与参考.

Abstract

The increasing shortage of land resources has led to the increase of engineering such as artificial reclamation of land from the sea,peak shaving and valley filling.Land reclamation engineering is facing different engineering and technical problems under different topographic and engineering geological conditions.Based on the actual situation of the land reclamation engineering in a low hilly red bed area in Sichuan,and referring to the importance of buildings in the site in the later stage,this paper discusses the post-construction settlement control standards,treatment methods and construction quality control measures of the land reclamation engineering,which can provide reference for similar projects.

关键词

红层缓丘区/造地工程/工后沉降

Key words

low hilly red bed area/land reclamation engineering/post-construction settlement