南方某城市污水系统提质增效措施探讨
Discussion on Measure for Quality and Efficiency Improvement of a Sewage System in the Southern City
胡伟强1
作者信息
- 1. 广州市创景市政工程设计有限公司,广东 广州 510030
- 折叠
摘要
文章以南方某城市污水厂为例,从污水入河及外水入厂两条主线入手,通过现状调研及现场排查,对片区存在河道水质不达标及污水厂进水浓度低的原因进行了分析,提出了工程措施与管理措施相结合的提质增效措施.能实现提升污水收集率、雨污分流率及污水厂进水生化需氧量(BOD)浓度的目标,排水系统提质增效并稳定运行.
Abstract
Taking a sewage plant in the southern city as an example,this paper analyzes the reasons for the substandard river water quality and the low influent concentration of the sewage plant in the area through the status investigation and on-site investigation from two main lines of sewage into the river and external water into the plant,and puts forward the quality and efficiency improvement measures by combining engineering measures with management measures.the goal of improving sewage collection rate,rainwater and sewage diversion rate and influent biochemical oxygen demand(BOD)concentration of sewage plant can be achieved,and the quality,efficiency improvement and stable operation of the drainage system can be realized.
关键词
污水系统/污水入河/外水入厂/提质增效Key words
sewage system/sewage into the river/external water into the plant/quality and efficiency improvement引用本文复制引用
出版年
2024