紧贴地铁车站共用地下墙的深基坑开挖对既有地铁结构的影响分析

扫码查看
文章以紧贴贵阳轨道交通 1号线中山西路站的新建基坑工程为依托,通过有限元软件进行数值模拟,得出了紧贴有地铁车站共用地下墙的深基坑开挖过程中既地铁结构的变形规律:基坑开挖时地铁结构发生朝基坑方向倾斜,最大变形为共用地下墙顶部及中部往基坑方向的水平位移,共用地下墙底部及轨行区侧墙则发生背向基坑的较小水平位移,共用地下墙附近的地表发生较小沉降、底板结构及道床出现少量隆起.对比研究数值模拟与现场监测成果后,提出了相关建议措施.
Analysis on the Influence of Deep Foundation Pit Excavation Close to the Common Underground Wall of Subway Station on the Existing Subway Structure
Based on the newly-built foundation pit en-gineering close to the West Zhongshan Road Station on Guiyang Rail Transit Line 1,the deformation law of the existing subway structure during the excavation of the deep foundation pit close to the common underground wall of the subway station is obtained by numerical simulation through the finite element software:during the excavation of the foundation pit,the subway structure tilts towards the direction of the foundation pit,the maximum deformation is the horizontal displacement from the top and middle of the common underground wall to the direction of the foundation pit,the bottom of the common underground wall and the side wall of the track area have a small hori-zontal displacement opposite to the foundation pit,and the ground surface near the common underground wall has a small settlement,and the bottom plate structure and the ballast bed have a small amount of uplift.After comparing the results of numerical simulation and field monitoring,relevant suggestions and measures are put forward.

deep foundation pit deformation monitoringexisting subway stationcommon underground walldeep foundation pit excavation

郑滔

展开 >

贵阳市公共交通投资运营集团有限公司,贵州 贵阳 550000

深基坑变形监测 既有地铁车站 共用地下墙 深基坑开挖

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(16)