Research on Construction Technology and Quality Control Measure of Tank in Sewage Treatment Plant
The sewage treatment plant is an important part of urban infrastructure construction.However,due to the large volume,complex structure and harsh service condition of the tank,it faces many technical problems and quality challenges in the construction process.This paper deeply discusses the key influencing factors of the construction technology and quality of the tank in sewage treatment plant,and puts forward corresponding optimiza-tion measures.The results show that based on the construc-tion process proposed in this paper,the temperature change trend of the six recording points in the mass concrete pouring of the tank is the same,and the maximum temper-ature difference is 9℃,which occurs when the concrete pouring is just completed;with the passage of time,the temperature of concrete gradually decreases,and the temperature difference gradually decreases;the average temperature change trend of the inner and outer sides of the concrete is the same,and the temperature difference between the inner and outer sides is relatively constant and basically controlled within 20℃.
tank constructionmass concretesewage treatment plantconstruction temperature