首页|水利工程建筑深基坑钢管桩支护施工技术

水利工程建筑深基坑钢管桩支护施工技术

扫码查看
文章主要从清除深基坑内淤泥积水、布置定位导向架、打入水利工程建筑深基坑钢管桩以及喷射浇筑混凝土四个方面设计水利工程建筑深基坑钢管桩支护施工方法,经过工程实例分析可以得到:该方法施工后最大形变量为1.8 mm,渗水量为0.01 m3/d,确保了基坑在施工和使用过程中的稳定性和安全性,显著降低了地下水对基坑施工和使用的影响.
Construction Technology of Steel Pipe Pile Support for Deep Foundation Pit of Water Conservancy Engineering Building
This paper mainly designs the construction method of steel pipe pile support for deep foundation pit of water conservancy engineering building from four aspects:removing silt water in deep foundation pit,arranging posi-tioning guide frame,driving steel pipe piles in deep foun-dation pit of water conservancy engineering building,and spraying and pouring concrete.After analyzing the engi-neering examples,it can be obtained that the maximum volume of deformation after the construction with this method is 1.8 mm,and the seepage amount is 0.01 m3/d,which ensures the stability and safety of the foundation pit in the process of construction and use,and significantly reduces the influence of groundwater on the construction and use of foundation pit.

deep foundation pit steel pipe pile supportwater conservancy engineeringguide frame

陈志春

展开 >

甘肃省水利水电勘测设计研究院有限责任公司,甘肃 兰州 730030

深基坑钢管桩支护 水利工程 导向架

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(18)