深基坑支护钢管立柱桩同步施工技术应用
The Application of Synchronous Construction Technology of Steel Pipe Column Pile for Deep Foundation Pit Support
邱洪玺1
作者信息
- 1. 惠州市智谷开发建设有限公司,广东 惠州 516032
- 折叠
摘要
为解决深基坑支护工程中超长钢管立柱桩吊装施工和桩顶与地面标高不一致的施工难题,文章通过采取钢管立柱桩拆分深化、设计钢管分段拼接辅助平台、垂直控制技术、吊筋预留技术、混凝土浇筑技术等方法,进行施工技术优化,减少了先进行土方开挖,再进行钢管立柱桩施工的机械设备二次进场,不仅缩短了工期,而且节省了工期成本和机械使用成本,可供参考.
Abstract
In order to solve the construction problems of super-long steel pipe column pile lifting construction and inconsistency between pile top and ground elevation in deep foundation pit support engineering,this paper opti-mizes the construction technologies by adopting the meth-ods of steel pipe column pile splitting deepening,the steel pipe segmental splicing auxiliary platform design,vertical control technology,suspension bar reservation technology,concrete pouring technology,etc,reduces the second entry of mechanical equipment caused by firstly carrying out earthwork excavation and then carrying out the steel pipe column pile construction,which not only shorten the con-struction period,but also save the construction period cost and machinery use cost.It can be used for reference.
关键词
深基坑支护/钢管立柱桩/旋挖成孔/辅助平台Key words
deep foundation pit support/steel pipe column pile/rotating into hole/auxiliary platform引用本文复制引用
出版年
2024