首页|曲线桥钢箱梁顶推施工关键技术研究

曲线桥钢箱梁顶推施工关键技术研究

扫码查看
文章以G94珠三角环线高速跨线曲线钢箱梁桥的顶推施工为研究对象,针对其复杂的施工条件和特殊的桥跨组合,提出了平台组装、步履式多点连续顶推的施工方案.通过对顶推工艺的深入分析和精细控制,确保了施工的安全高效.研究成果可为类似桥梁工程施工提供重要的技术参考.
Research on Key Technology of Steel Box Girder Incremental Launching Construction of Curved Bridge
This paper takes the incremental launching con-struction of G94 Pearl River Delta ring expressway cross-line curved steel box girder bridge as the research object,and puts forward the construction scheme of platform assembly and walking multi-point continuous incremental launching in view of its complicated construction condi-tions and special bridge-span combination.Through in-depth analysis and fine control of the incremental launch-ing process,the safety and efficiency of the construction are ensured.The research results can provide important technical references for the construction of similar bridge engineering.

curved bridgesteel box girderincremental launching processwalking incremental launching equip-ment

黄志文

展开 >

广东冠粤路桥有限公司,广东 广州 511499

曲线桥梁 钢箱梁 顶推工艺 步履式顶推设备

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(18)