首页|建筑工程灌注桩后注浆施工技术研究

建筑工程灌注桩后注浆施工技术研究

扫码查看
随着建筑技术的不断进步,灌注桩后注浆施工技术因其能有效提高桩基承载力而得到大范围应用.然而,在实际施工过程中,该项技术仍然存在标准化程度不高、质量控制难度大及成本与效益不匹配等问题,安全风险管理也不足.文章通过系统分析这些问题,提出了针对性的解决策略,以优化灌注桩后注浆施工技术的应用.通过制定统一的技术标准、加强施工过程中的质量控制、优化成本与效益分析及强化安全风险管理,提高灌注桩后注浆施工技术的应用效果,对推动该技术的标准化、规范化和高效化应用具有重要意义.
Research on Cast-in-place Pile Post Grouting Construction Technology in Building Engineering
With the continuous progress of building tech-nology,cast-in-place pile post grouting construction technology has been widely used because it can effectively improve the bearing capacity of pile foundation.However,in the actual construction process,this technology still has problems such as low degree of standardization,difficult quality control and mismatch between cost and benefit,and the safety risk management is insufficient.By systemati-cally analyzing these problems,this paper proposes target-ed solutions to optimize the application of cast-in-place pile post grouting construction technology.It is of great significance to promote the standardization,normalization and efficient application of this technology by formulating unified technical standards,strengthening quality control in the construction process,optimizing cost and benefit anal-ysis,and strengthening safety risk management to improve the application effect of cast-in-place pile post grouting construction technology.

cast-in-place pile post grouting construction technologybuilding engineeringpile foundation bearing capacityfoundation

许志伟

展开 >

厦门特房建设工程集团有限公司,福建 厦门 361100

灌注桩后注浆施工技术 建筑工程 桩基承载力 地基

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(18)