Analysis on Construction Safety Risk Management Measure for High-rise Housing Building Engineering
In view of the safety risk management problems existing in the construction of high-rise housing building engineering,this paper constructs an evaluation system in-cluding four main indicators of personnel risk,equipment risk,material risk and environmental risk.The TOPSIS model is used to calculate and analyze three construction schemes,and the nearness degree results between each scheme and the ideal solution are obtained.The results show that scheme 1 has the highest nearness degree,in-dicating that its safety risk management effect is the best.The research is helpful to provide scientific reference for the construction safety risk management of high-rise housing building engineering,so as to improve the con-struction safety management level,reduce the incidence of accidents,ensure the personal safety and property safety of construction personnel,and promote the sustainable de-velopment of the construction industry.
construction safety risk managementhigh-rise housing building engineeringTOPSIS model