凤凰110 kV变电站施工要点研究

扫码查看
随着电力系统的快速发展,110 kV变电站作为电网重要的枢纽节点,其建设质量直接关系电力系统的稳定运行和供电可靠性.文章旨在探讨凤凰 110 kV变电站在电气专业施工过程中采用的关键技术和方法,分析施工中可能遇到的技术难题,并提出相应的解决方案.通过对现代电气工程施工技术的深入研究,结合凤凰 110 kV变电站的具体特点,提出了一套系统的施工技术方案,包括施工准备、主要施工流程及现场安全管理等方面的内容.
Research on Key Construction Point of Fenghuang 110 kV Substation
With the rapid development of power system,110 kV substation as an important hub node of power grid,its construction quality is directly related to the stable op-eration and power supply reliability of power system.This paper aims to explore the key technologies and methods used in the electrical specialty construction process for Fenghuang 110 kV substation,analyze the technical prob-lems that may be encountered in the construction,and put forward the corresponding solutions.Through the in-depth study of modern electrical engineering construction tech-nology,combined with the specific characteristics of Fen-ghuang 110 kV substation,a set of systematic construction technology scheme is proposed,including construction preparation,main construction process and on-site safety management.

110 kV substationelectrical specialtycon-struction technologysafety management

姚波

展开 >

宁夏龙源电力有限公司,宁夏 固原 756000

110 kV变电站 电气专业 施工技术 安全管理

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(18)