Research on Key Construction Point of Fenghuang 110 kV Substation
With the rapid development of power system,110 kV substation as an important hub node of power grid,its construction quality is directly related to the stable op-eration and power supply reliability of power system.This paper aims to explore the key technologies and methods used in the electrical specialty construction process for Fenghuang 110 kV substation,analyze the technical prob-lems that may be encountered in the construction,and put forward the corresponding solutions.Through the in-depth study of modern electrical engineering construction tech-nology,combined with the specific characteristics of Fen-ghuang 110 kV substation,a set of systematic construction technology scheme is proposed,including construction preparation,main construction process and on-site safety management.