某临建项目桁架结构设计分析

扫码查看
当前,国家建设的不断发展对建设项目前期的临时性建筑提出了更规范化的要求.文章基于某铁路项目临时拌和站料仓,通过模型对比计算,分析了临建工程中的空间桁架结构截面选取、钢托梁设计相关内容,并研究了大跨度空间桁架结构抽柱处理的可靠性.最后,还展示了满足国家规范要求的临时桁架建筑设计参数,并提出临建桁架标准化及可优化设计方案.对减少项目前期投资及缩短主体工程建设周期有一定的参考价值.
Analysis on the Truss Structure Design of a Temporary Construction Project
Currently,the continuous development of na-tional construction puts forward more standardized re-quirements for the temporary buildings in the early stage of the construction project.Based on the temporary mixing station's bunker of a railroad project,this paper analyzes the selection of cross-section of space truss structure and the design of steel joist in the temporary construction engi-neering through model comparison calculation,and studies the reliability of the column extraction treatment for large-span space truss structure.Finally,the design parameters of temporary truss building that meet the requirements of national codes are demonstrated,and the standardized and optimized design scheme of the temporary truss is pro-posed.It has certain reference value for reducing the pro-ject preliminary investment and shortening the construc-tion period of the main engineering.

temporary truss buildingnational codestandardization

王文耘

展开 >

中铁十二局集团建筑安装工程有限公司,山西 太原 030000

临时桁架建筑 国家规范 标准化

2024

工程技术研究
广州钢铁企业集团有限公司

工程技术研究

影响因子:0.081
ISSN:2096-2789
年,卷(期):2024.9(18)