Bensteel Group invested in the construction of CCPP gas turbine combined cycle power generation project,and the main engine was introduced into Shanghai Electric Ansaldo AE94.2KS gas turbine,which is the first time that this model is applied in low calorific value combined cycle power generation project of iron and steel enterprises.The Ansaldo design concept is very different from the domestic users'needs.During the project implementation,the system design was optimized to improve the functional integrity,opera-tion and maintenance feasibility.At the same time,the thermal system was optimized with a gas turbine complex cycle to improve the efficiency of the combined cycle.
关键词
低热值燃气轮机/联合循环发电/系统设计优化
Key words
low calorific value gas turbine/combined cycle power generation/system design optimization