Discussion on Some Problems of Fire-Fighting Water Supply Design of Coking Project for Large Iron and Steel Metallurgy Enterprises
The coking project of modern large-scale iron and steel metallurgical enter-prises mainly consists of coal preparation system,coking facilities,dry quenching facilities,coke treatment system,gas purification system and other production facilities and auxiliary production facilities.The raw materials,fuels and their storage,transportation and production used in the production process are mostly combustible,flammable and explosive materials,and the possibility of fire accidents and the destructiveness after fire are large,therefore,as an important part of the fire-fighting design of coking project,the fire-fighting water supply system should be especially emphasized.Several practical problems of fire-fighting water sup-ply system in coking engineering are discussed and some suggestions and opinions are made,which can help to optimize the design of fire-fighting water supply in coking engi-neering.
coking and chemical engineeringfire-fighting designfire-fighting water supply system