This paper analyzes the problems existing in the CCPP pressurizing station,formulates the optimization scheme for the CCPP pressurizing system,expounds the implementation process of optimization measures,and solves the problems in the trial operation after optimization,thus improving the generating efficiency of the CCPP generator set and ensuring the stable operation of the CCPP pressurizing station.
关键词
鼓风机/止回阀/气动阀/CCPP加压站
Key words
blower/check valve/pneumatic valve/CCPP pressurizing station