OPTIMIZATION AND PRACTICE OF SWRCH22A PRODUCTION PROCESS
The article introduces the existing equipment and process conditions of Beiying Steelmaking Plant,analyzes the reasons for nodulation at the tundish nozzle during the production of cold heading steel SWRCH22A,optimizes the process production process,and formulates nodulation control measures.
Cold heading steelnodulation at the tundish nozzleAl2O3Calcium treatment