Layout design characteristics and operational performance of Tanggang New Area Process
Design is the original of competition.The design theory and overall objective,plane layout,workshop layout & optimization and operation effect of the Tanggang New Area Process of HBIS Group were analyzed.The process fully implements the theory of metallurgical process engineering,adopts dynamic and precise design methods,and constructs an optimized process network from the as-pects of general layout design,workshop layout and optimization,logistics transportation design,etc.,achieving the goals of simplicity,compactness,intensification,and smoothness.This enables the be-havior of"flow"to operate in accordance with dynamic,orderly,collaborative and continuous stand-ards,and achieves the"minimization"of dissipation during the operation process.Since its produc-tion,significant progress has been made in the operational indicators of various interfaces in the entire process through dynamic operation improving by the idea of cyber phsical systems.
general layoutprocess networkdesign conceptinterface technology