首页|大容量主变低压侧电能质量监测与设备选择分析

大容量主变低压侧电能质量监测与设备选择分析

扫码查看
近年来220 kV变电站采用低压侧10 kV向用户直供负荷的供电方式得到推广,随之带来的是主变低压侧进线设备存在工作电流大、短路水平高、造价和损耗高等现实问题造成选型较为困难.本文分析了存在的问题,并提供了一种基于LSTM的电能质量监测模型,并就设备选择策略给出了几种可行的解决方案.
Analysis of Power Quality Monitoring and Equipment Selection for Low Voltage Side of Large Capacity Main Transformers
In recent years,the power supply method of 220 kV substations using 10 kV on the low-voltage side to directly supply loads to users has been promoted,which has brought about practical problems such as high working current,high short-circuit level,high cost and loss of the low-voltage side incoming equipment of the main transformer,making selection more difficult.This article analyzes the existing problems and provides several feasible solutions.

220 kV substationlarge capacity main transformer10 kV direct supply load equipment selection