大型水电站在流域水电梯级开发中往往充当着核心控制性作用,本文讨论水电站主变压器设备配置问题分析,主要完成了电气主接线和厂用电接线的设计分析、导体和高压电气设备选择等分析任务.在设计过程中严格遵守相关的规程,对于每个可选择的方式进行比较和全面论述.
Analysis of Equipment Configuration Issues for Main Transformers in Hydropower Stations
Large and medium-sized hydropower stations often play a core control role in the development of water elevators in the river basin.This article discusses the analysis of equipment configuration issues for main transformers in hydropower stations,it has mainly completed the design and analysis of electrical main wiring and factory electrical wiring,and the selection of conductors and high-voltage electrical equipment.Strictly abide by the relevant procedures in the design process,and compare and comprehensively discuss each optional method.