Research on the Impact and Control of the Filling Coefficient on the Project Cost Under the New Power System
Under the"double carbon"goal vision,building a new power system is an important development direction of the national energy strategy,and infrastructure engineering is the cornerstone and effective carrier of system construction.This article aims to analyze the factors affecting the filling coefficient in the construction process from the aspects of personnel,machinery,materials,construction methods,construction environment,etc.,start with the control of the whole process of project cost,and proposenew methods and ways for the control of concrete filling coefficient of power grid infrastructure projects,so as to ensure that the quality of the project meets the standards and effectively determine the project cost.
New Power SystemFilling CoefficientCoagulantIrrigation PileProject Cost