ANALYSIS AND EVALUATION OF HYDROGEOLOGICAL CHARACTERISTICS OF THE FIRST PHASE CONSTRUCTION PROJECT OF HUIZHOU SHIZISHAN PARK
The construction project of Huizhou Shizishan Park recently planned an underpass tunnel project on the north and east sides of the Huolishuian functional area.During and after the construction,it may cause the landscape lake to shrink or dry up.In order to find out the hydrogeological conditions,the hydraulic connection between surface water and groundwater and the influence of the proposed tunnel on surface water in this area,field work was carried out by hydrogeological surveying and mapping,hydrogeological drilling and geophysical exploration.The results show that the complexity of hydrogeological conditions in this area is simple,the overall water quantity is poor,and the hydraulic connection between groundwater and surface water is weak.These results provide hydrogeological data and basis for the planning and construction of active waterfront functional areas.
HydrogeologyGroundwaterWater Injection and Pumping TestAnalysis and EvaluationHizishan ParkHuizhou,Guangdong