二段炉内衬更换施工控制要点简述
Briefly Describe the Key Points of Construction Control for Replacing the Lining of the Second Stage Furnace
金祥1
作者信息
- 1. 云南天鸿化工工程股份有限公司,云南 昆明 650011
- 折叠
摘要
从二段炉内衬更换施工作业准备、作业程序、作业方法、作业内容、作业技术要点、质量控制要点等方面,论述了内衬更换施工过程及重点部位的控制要点.
Abstract
This article discusses the construction process and key control points of lining replacement in the second stage furnace from the aspects of preparation,operation procedures,operation methods,construction content,operation technical points,quality control points,etc.,com-bined with the actual lining replacement.
关键词
二段炉/内衬/更换/施工过程/过程控制/质量控制/控制要点Key words
secondary reformer/lining/replace/construction process/process control/quality control/control points引用本文复制引用