云南水力发电2024,Vol.40Issue(1) :1-4.DOI:10.3969/j.issn.1006-3951.2024.01.001

论取水工程原水自流管水下施工技术

Underwater Construction Technology for Raw Water Self Flowing Pipes in Water Intake Projects

裴瑞
云南水力发电2024,Vol.40Issue(1) :1-4.DOI:10.3969/j.issn.1006-3951.2024.01.001

论取水工程原水自流管水下施工技术

Underwater Construction Technology for Raw Water Self Flowing Pipes in Water Intake Projects

裴瑞1
扫码查看

作者信息

  • 1. 中国水利水电第十四工程局有限公司,云南 昆明 650041
  • 折叠

摘要

随着城市的高速发展,用水量也随之快速增长,输水管道的直径也越来越大,大管径沉管施工技术快速发展.以广西扶绥第二自来水厂取水工程原水自流管道沉管工程施工为例,系统地对自流管道沉管施工的关键工序进行介绍.

Abstract

With the rapid development of cities,water consumption has also increased rapidly,and the diameter of water pipelines is also getting larger.The construction technology of large-diameter sunken pipes is developing rapidly.Taking the construction of the natural water flow pipeline sinking project of the water intake project of Guangxi Fusui Second Water Plant as an example,this paper systematically introduces the key processes of the natural water flow pipeline sinking construction.

关键词

自流管/水下沟槽开挖/沉管施工/关键工序

Key words

gravity line/underwater trench excavation/sinking construction/key process

引用本文复制引用

出版年

2024
云南水力发电
云南水力发电工程学会

云南水力发电

影响因子:0.213
ISSN:1006-3951
参考文献量7
段落导航相关论文